1.
IMPROVING PRODUCTIVITY THROUGH EVALUATION AND IMPROVEMENT OF SETUP TIME ON PIPE LASER CUTTING MACHINE USING SINGLE MINUTE EXCHANGE OF DIE (SMED) METHOD. PRODUCTIVITY. 2025;2(5):2544-2555. doi:10.62207/0425pp56